Net Metering

Solar Panels

In order to qualify as an Eligible Net Metering Facility, the generating facility must comply with all PC Electric requirements. Eligible generating sites can be residential or commercial that are fueled by solar, wind, hydroelectric, geothermal, biomass, fuel cell, or micro turbines that are fueled by renewable resources.

Before Installation

A member seeking to interconnect an Alternative Source Generating Facility to the cooperative’s system must submit all applicable forms provided by PC Electric to the cooperative’s designated personnel for review and approval before begining installation. Member-owned generator equipment and installations must be installed in accordance with the manufacturer’s specifications as well as all applicable provisions of the National Electrical Code,PC Electric, as well as state and local codes.

Service Requirements

Please fill out the the blank fields below and submit to PC Electric.

Then you MUST download, print, and fill out the Standard Interconnection Agreement.  Once the agreement has been filled out and signed, it may be faxed to PC Electric at 225-638-8124, emailed to jjewell@pcemc.org or cspears@pcemc.org, or mailed to:

PC Electric
Attention: James Jewell
P.O. Box 160
New Roads, LA 70760

Do not install before downloading and completing the agreement below.

Standard Interconnection Agreement

Please include area code
PC Electric Adopt a School
Save Energy with PC Electric
PC Electric Storm Prep Information