In order to qualify as an Eligible Net Metering Facility, the generating facility must comply with all Pointe Coupee Electric requirements. Eligible generating sites can be residential or commercial that are fueled by solar, wind, hydroelectric, geothermal, biomass, fuel cell, or micro turbines that are fueled by renewable resources.

Before Installation

A member seeking to interconnect an Alternative Source Generating Facility to the cooperative’s system must submit all applicable forms provided by Pointe Coupee Electric to the cooperative’s designated personnel for review and approval before begining installation. Member-owned generator equipment and installations must be installed in accordance with the manufacturer’s specifications as well as all applicable provisions of the National Electrical Code, Pointe Coupee Electric, as well as state and local codes.

SERVICE REQUIREMENTS:

Alternate Source Overhead Service

Alternate Source Underground Service
 

 

Please fill out the the blank fields below and submit to Pointe Coupee Electric.

 

Then you MUST download, print, and fill out the Standard Interconnection Agreement below.  Once the agreement has been filled out and signed, it may be faxed to Pointe Coupee Electric at 225-638-8124, emailed to jjewell@pcemc.org or cspears@pcemc.org, or mailed to:

Pointe Coupee Electric
Attention: James Jewell
P.O. Box 160
New Roads, LA 70760

 

Do not install before downloading and completing the agreement below.

Standard Interconnection Agreement

 

If applicable, please provide your existing Pointe Coupee Electric account number.
Please provide a correct email address so that a response to your inquiry can be sent to you.
Please provide the best phone number to contact you including the area code. e.g. XXX-XXX-XXXX
Standard Interconnection Agreement
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.